org.codehaus.sonar-plugins » sonar-ldap-plugin
Enables the delegation of Sonar authentication to LDAP.
更新时间: 2014-01-09 22:57org.codehaus.sonar-plugins » sonar-scm-stats-plugin
Feed Sonar with Statistics about SCM system
更新时间: 2013-09-23 21:18org.codehaus.sonar-plugins » sonar-jira-plugin
Retrieves the number of project issues from Atlassian JIRA.
更新时间: 2013-07-03 16:03org.codehaus.sonar-plugins » sonar-mantis-plugin
Retrieves the number of project issues from Mantis BugTracker.
更新时间: 2013-04-29 05:51org.codehaus.sonar-plugins » sonar-cxx-plugin
C++ Plugin for Sonar
更新时间: 2013-02-18 17:00org.codehaus.sonar-plugins » sonar-xml-plugin
Analyze XML and XHTML documents.
更新时间: 2013-02-01 18:19org.codehaus.sonar-plugins » sonar-trac-plugin
Retrieves and reports the number of project issues from a Trac instance.
更新时间: 2013-01-27 01:54org.codehaus.sonar-plugins » sonar-total-quality-plugin
Provides an overall measure of the quality of the project, linking code quality, design, architecture, and unit testing.
更新时间: 2013-01-27 00:40org.codehaus.sonar-plugins » sonar-build-breaker-plugin
Break the analysis batch if at least one alert threshold is hit.
更新时间: 2013-01-04 23:18org.codehaus.sonar-plugins » sonar-emma-plugin
Emma is an alternative to Clover and Cobertura to measure coverage by unit tests.
更新时间: 2012-12-20 21:44org.codehaus.sonar-plugins » sonar-google-calendar-plugin
Plugin that integrates Sonar with Google Calendar providing simple functionality
更新时间: 2012-12-06 18:40org.codehaus.sonar-plugins » sonar-pam-plugin
Allow Sonar to use PAM authentication on *nix box.
更新时间: 2012-11-25 03:19org.codehaus.sonar-plugins » sonar-switch-off-violations-plugin
Sonar Switch Off Violations Plugin
更新时间: 2012-10-25 20:04org.codehaus.sonar-plugins » sonar-openid-plugin
Enable user authentication and Single Sign-On through an OpenID provider
更新时间: 2012-10-24 17:58org.codehaus.sonar-plugins » sonar-cutoff-plugin
Exclude files from analysis based on a cutoff date threshold. Any source file that was last modified prior to the configured cutoff date is excluded. This can be useful when you want to analyze the work done on an existing code base and measure the quality of new code/changes only. This way previous phases of the project will not impact the analysis.
更新时间: 2012-10-19 16:29仓库 | 个数 |
Central | 592045 |